Technical Rule – Code of Practice. DVGW G (A) |June Pressure testing methods for gas transmission/gas distribution. DVGW G – DVGW G Polyethylen gas pipelines with an operating pressure up to and including 10 bar (PE 80, PE and PE-Xa) -. Technical rule [WITHDRAWN] Article is not orderable. DVGW G Compression strength test for pipelines and facilities of gas supply.

Author: |
Guzuru Shakagul |
Country: |
Comoros |
Language: |
English (Spanish) |
Genre: |
Spiritual |
Published (Last): |
12 March 2006 |
Pages: |
484 |
PDF File Size: |
1.95 Mb |
ePub File Size: |
12.95 Mb |
ISBN: |
882-2-21965-929-2 |
Downloads: |
77537 |
Price: |
Free* [*Free Regsitration Required] |
Uploader: |
Yozuru |

To stabilize the pipeline section when the soil has finally settled and the cement-mortar lining has absorbed sufficient water. Determines the dvw of air still in the pipeline. It is carried out over a period of 3 hours for pipes up to DN The pressure test is carried out in a maximum of three steps.
Each pipeline must be subjected to a pressure test after it has been laid.
The main test xvgw a test of the entire system, and in particular of the watertightness and proper execution and installation of the pipes, fittings, etc. Carry out as specified by the planner Main test: The test sections must be defined so that: The water loss method see DVGW Worksheet W can be used as an equivalent alternative to the pressure loss method described above.
Hydrostatic testing — CEPS a.s.
There are two basic test methods: This applies in particular to pipelines with mechanical socket connections. The joints need not be covered by backfill. The pressure must be brought back to the test level at regular intervals and in any case after a drop of 0.

Water absorption in the cement-mortar pores may initially cause a drop in pressure even if the pipeline is completely watertight. The pressure loss may amount to:.
Pressure test ǀ Mannesmann Line Pipe
Drucken Teilen Xing Twitter. The pressure loss may amount to: Before the pressure test can be carried out, the pipeline must be covered with backfill material so as to avoid shifts in position, which could cause leaks. The pressure test must be carried out in compliance with the requirements laid down in the relevant rules and regulations, e.

Before starting the test, the pipeline must be slowly and evenly filled with water at a rate of about 0. The test sections must be defined so that:. The pipeline is to be tested over its entire length or, if necessary, in sections.
Pressure tests must be carried out by qualified personnel with the relevant knowledge of pipeline engineering, the execution of pressure tests, the measurement techniques and the applicable safety regulations. For this reason it is advisable to carry out the pressure test over a period of at least 24 hours.